OTHER

Klayout DRC implementation and optimization-Tender: Klayout DRC implementation and optimization Introduction: IHP GmbH is developing an openPDK for SiGe BiCMOS technology SG13G2 to improve access to this technology. The aim is to promote the training of chip designers in Germany and Europe as a key focus. For analog IC design layout tool KLayout is used. DRC features need to be established for this tool. IHP want to outsource a part of this work. Current Status: - DRC Rule Deck: Most of DRC rules are implemented with a semiautomated approach. 216 DRC rules are not implemented yet. Regularly maintained and currently up to date. - Critical Rules: 91 critical rules are implemented but runtime is slow. A manual DRC implementation has the potential to reduce run time by a factor of 2. - Quality assurance (QA) cells: Layer QA cells and device QA cells to verify DRC implementation are available Scope of Requirement: IHP seeks qualified suppliers to implement missing DRC rules and optimise 91 critical rules. List of rules is provided in an extra Excel sheet. Rule documentation can be found in IHP open PDK https://githucom/IHP-GmbH/IHP-Open-PDK. Qualifications Request for Potential Suppliers: Suppliers must demonstrate: 1. Expertise in Verification Tools: Extensive experience with KLayout and implementing DRC rule decks. 2. Technical Proficiency: A solid history of maintaining, debugging, and enhancing rule decks, with examples of previous similar projects. 3. Resource Availability: Commitment of at least 400 hours within 4 month period to fulfil IHP project requirements. 4. Collaborative Capability: Proven ability to work effectively with semiconductor project teams to meet specific verification needs. 5. Quality Assurance: A robust process to ensure the accuracy, reliability, and completeness of rule decks. Submission of Quotation: Qualified suppliers are invited to submit their proposals, which should include details of their experience, approach to the project, and how they meet the above qualifications. Proposals should also provide a possible timeline to achieve the goal within 4 month after project start.

IHP GmbH

Klayout DRC implementation and optimization-Tender: Klayout DRC implementation and optimization Introduction: IHP GmbH is developing an openPDK for SiGe BiCMOS technology SG13G2 to improve access to this technology. The aim is to promote the training of chip designers in Germany and Europe as a key focus. For analog IC design layout tool KLayout is used. DRC features need to be established for this tool. IHP want to outsource a part of this work. Current Status: - DRC Rule Deck: Most of DRC rules are implemented with a semiautomated approach. 216 DRC rules are not implemented yet. Regularly maintained and currently up to date. - Critical Rules: 91 critical rules are implemented but runtime is slow. A manual DRC implementation has the potential to reduce run time by a factor of 2. - Quality assurance (QA) cells: Layer QA cells and device QA cells to verify DRC implementation are available Scope of Requirement: IHP seeks qualified suppliers to implement missing DRC rules and optimise 91 critical rules. List of rules is provided in an extra Excel sheet. Rule documentation can be found in IHP open PDK https://githucom/IHP-GmbH/IHP-Open-PDK. Qualifications Request for Potential Suppliers: Suppliers must demonstrate: 1. Expertise in Verification Tools: Extensive experience with KLayout and implementing DRC rule decks. 2. Technical Proficiency: A solid history of maintaining, debugging, and enhancing rule decks, with examples of previous similar projects. 3. Resource Availability: Commitment of at least 400 hours within 4 month period to fulfil IHP project requirements. 4. Collaborative Capability: Proven ability to work effectively with semiconductor project teams to meet specific verification needs. 5. Quality Assurance: A robust process to ensure the accuracy, reliability, and completeness of rule decks. Submission of Quotation: Qualified suppliers are invited to submit their proposals, which should include details of their experience, approach to the project, and how they meet the above qualifications. Proposals should also provide a possible timeline to achieve the goal within 4 month after project start.

Ähnliche Ausschreibungen

Ausschreibungsinformationen

Veröffentlichungsdatum

Angebotsfrist

Ausschreibungs-ID

01jppxhnmgm9pcz84yhgry03bp